Projection Introduction

Architectural wayfinding airport signage by Capital Arts
  • Location: Phnom Penh, Cambodia
  • Client: https://www.techoairport.com.kh
  • Main Contractor: Capital Arts Cambodia Co., Ltd.
  • Project Duration: 4 June 2023 – 3 September 2025
  • Category: Airport Wayfinding & Accessibility Solutions

Project Overview

Capital Arts Cambodia successfully delivered a complete Braille signage solution for Techno International Airport—one of Cambodia’s largest and most advanced aviation developments. This project required strict adherence to international accessibility standards to ensure the airport environment is inclusive, safe, and easy to navigate for passengers with visual impairments.

Client Objective

The airport development team required:

  • High-precision Braille directional signs,

  • Consistent placement following global wayfinding standards,

  • Durable materials suitable for long-term use,

  • A signage system that meets ADA-compliant braille standards while aligning with the airport’s modern design identity.

The Challenge

  • This was a unique project in Cambodia because Braille signage production is still very new in the local market, and few companies possessed the experience or technical understanding to deliver it correctly. The challenges included:

    • Lack of local references for Braille production

    • Ensuring correct Braille translation and dot spacing

    • Finding the right tactile materials and embossing techniques

    • Meeting airport safety and durability requirements

    • Coordinating with multiple contractors during construction

Accessible braille sign with raised text installed at an airport facility by Capital Arts Cambodia.
School teacher testing a braille sign to ensure tactile readability.

Our Approach

1. Collaboration with Braille Education Experts

We connected with a specialized school for visually impaired learners in Cambodia to ensure all Braille translations, dot heights, spacing, and character accuracy met recognized standards.

2. Material & Technique Development

We developed custom prototypes using:

  • High-grade acrylic and stainless steel

  • Precision engraving and tactile embossing

  • Long-lasting polyurethane finishes for high-traffic areas

These prototypes were tested and approved before mass production.

3. Engineering & Fabrication

Our engineering team created detailed technical drawings for every sign, ensuring:

  • Perfect tactile height

  • Accurate character layout

  • Easy recognition for visually impaired users

All signs were produced in our own fabrication facility using advanced CNC and laser engraving systems.

4. Installation & Quality Assurance

Installation followed strict guidelines for height, placement, and accessibility.
Post-installation, Capital Arts performed a full QA inspection with the airport team.

Project Outcome

The completed Braille signage system provides:

  • Clear and accessible navigation for visually impaired passengers

  • International-standard tactile quality

  • Durable signs designed for long-term airport use

  • Seamless integration with the overall airport branding and architecture

This project showcases Capital Arts’ ability to deliver specialized, high-precision signage with social impact, marking one of the first large-scale Braille signage implementations in Cambodia.

Client Feedback

“The Braille signage system was completed with great accuracy and met all accessibility requirements.Capital Arts delivered precise, high-quality signage with excellent attention to detail.”

Project Team

  • Project Director: Mario Yahya

  • Project Manager: (Pho Phalkun — Capital Arts Team)

  • Safety Officers: 2

  • Scaffolding Crew: 10

  • Gondola Operators: 12

  • Installation Crew: 20

  • Production Team: 30


Project Highlights

    • First large-scale Braille signage project in Cambodia

    • Collaboration with education experts specializing in Braille

    • Fully compliant with global accessibility standards

    • High-precision fabrication and installation

    • Delivered within the airport construction timeline